| Products | Purchasing | Installation | Guarantee | Testimonials | Harley Gallery | Buell Gallery | A Word | Privacy Policy | Contact | Home | 






OIL COOLER INSTALLATION INSTRUCTIONS FOR
BUELL MOTORCYCLE
CLICK ILLUSTRATIONS TO VIEW DETAIL AND INSTRUCTIONS

THE ILLUSTRATION BELOW:

DOES NOT SHOW THE ACTUAL LOCATION OF ANY COMPONENTS. IT IS ONLY A SCHEMATIC DIAGRAM OF THE OIL FLOW CIRCUIT. THE THERMOVALVE AND COOLER ARE INTEGRATED INTO THE OIL FLOW CIRCUIT BETWEEN THE OIL FILTER AND THE OIL BAG.

NOTE: THESE INSTRUCTIONS PERTAIN ONLY TO THE PLACEMENT OF THE COOLER AND THERMOVALVE INTO THE MOTOR'S LUBRICATING SYSTEM. THE TYPE OF HOSES USED, ROUTING OF HOSES, AND THE PHYSICAL POSITIONING OF THE THERMOVALVE IS LEFT TO THE DISCRETION OF THE INSTALLER.


  1. Remove the Oil Hose that connects from the Filter to the Oil Bag.
  2. Install a Hose from the Oil Filter to Port (A) of the Thermovalve (RED CAP).
  3. Install a Hose from Port (B) of the Thermovalve to one side of the Cooler.
  4. Install a Hose from the other side of the Cooler to Port (C) of the Thermovalve.
  5. Install a Hose from Port (D) of the Thermovalve to the Oil Bag.